Home › Blog › Kickout and Diverter Flashing
Air & Water Barriers · Common Failures

Common Kickout and Diverter Flashing Mistakes and How to Avoid Them

Without a kickout, water flowing off the end of a roof-to-wall step flashing is dumped directly onto the wall and into the cladding below.

Better Buildings Start Here

Whether you’re dealing with an active issue or planning your next project, ACE has the expertise, accreditation, and team to protect your investment.

Better Buildings Start HereWhether you’re dealing with an active issue or planning your next project, ACE brings the expertise, accreditation, and senior team to protect your investment.
Quick answerMost kickout and Diverter Flashing failures trace to a short list of recurring mistakes in detailing, sequencing, and installation. Knowing them lets a team catch the problem before it becomes a leak, a callback, or a claim.

The kickout and Diverter Flashing problems ACE investigates almost always — Without a kickout, water flowing off the end of a roof-to-wall step flashing is dumped directly onto the wall and into the cladding below.

The details that make kickout and Diverter Flashing work rarely stay in one silo. The same discipline runs through Flashing Transitions, Roof Equipment Penetrations, and Where Water Enters. This article covers what matters most and how ACE approaches it.

The economics are worth stating up front. A detail corrected during design costs a fraction of the same fix during construction, which is itself far cheaper than a repair once the building is occupied — often by roughly an order of magnitude at each stage. That is why kickout and Diverter Flashing, handled early and verified, is one of the least expensive forms of insurance a project can buy against a leak, a callback, or a claim.

Where Kickout and Diverter Flashing Fails

Most kickout and Diverter Flashing problems are not exotic. They cluster around a few recurring failure points that a trained eye learns to check first.

  • Missing kickout: Without a kickout, water running down the step flashing at a roof-to-wall intersection is dumped directly onto the wall below.
  • Undersized or flat kickout: Small or poorly formed kickouts overflow during heavy rain and send water behind the cladding.
  • Not integrated with the barrier: Kickouts set over the barrier instead of lapped into it let water track behind the flashing.
  • Gutter ends short: Gutters that stop short of the kickout discharge water onto the wall instead of into the gutter.

None of these is unusual, and that is the point. When kickout and Diverter Flashing leaks or underperforms, the cause is almost always one of these conditions rather than a rare material defect. That is good news for owners and design teams, because it means the failures are predictable and therefore preventable: disciplined detailing catches most of them on paper, and construction-phase inspection catches the rest before they are hidden by finishes. The failures that reach a defect claim are almost never the ones nobody could have foreseen — they are the ones nobody checked.

Building envelope condition relevant to kickout and Diverter Flashing
Kickout and Diverter Flashing is judged by the whole assembly, not one component.

Specifying Kickout and Diverter Flashing So It Performs

Specifying kickout and Diverter Flashing correctly is where performance is decided, long before anyone is on a ladder. The specification has to name the performance, the standards, and the detailing rather than assume the field will sort it out.

  • Kickout detail: Specify kickouts at every roof-to-wall termination.
  • Size: Specify size for flow.
  • Barrier integration: Detail laps.
  • Gutter coordination: Coordinate gutter ends.

Written this way, the specification gives the installer a target and the inspector something to verify. ACE writes kickout and Diverter Flashing to the recognized standards and to constructable details — details a crew can actually build in real field conditions, not elegant ones that fail on site.

Dealing with kickout and Diverter Flashing on your project?

Get the design, testing, and documentation matched to what the building actually needs.

Schedule a consultationCall (866) 389-8883

How ACE Tests and Verifies Kickout and Diverter Flashing

Verifying kickout and Diverter Flashing is what separates an opinion from evidence. ACE relies on accredited and diagnostic methods matched to the assembly and the question being asked.

  • Diagnostic water testing: Testing the roof-to-wall area shows where water enters.
  • Exploratory openings: Opening cladding below the intersection.
  • Visual inspection: Checking for missing kickouts.

The right method depends on the goal — confirming a whole system, isolating a single leak, or documenting a condition for a claim. Choosing it deliberately, and running it to the recognized standard, is what makes the result defensible. An accredited test performed to procedure produces evidence that holds up in a warranty dispute or a courtroom; the same observation made informally is only an opinion. That difference is why ACE treats testing as the point where responsibility for kickout and Diverter Flashing is either established or lost, not as a box to check.

Field assessment of kickout and Diverter Flashing on a commercial project
ACE verifies kickout and Diverter Flashing with accredited and diagnostic methods.

Repair and Remediation Options

When kickout and Diverter Flashing fails, the right response depends on the cause — which is why ACE diagnoses before it prescribes. Common repair paths, in rough order of scope, are:

Problem

Without a kickout, water running down the step flashing at a roof-to-wall intersection is dumped directly onto the wall below.

Solution

Adding kickouts requires cladding removal.

Resolution

Extending gutters.

  • Install kickouts: Adding kickouts requires cladding removal.
  • Repair damage: Replacing damaged sheathing.
  • Gutter modifications: Extending gutters.

The scope depends on how far the problem has spread and what access the building allows. Repairing the symptom without fixing the source is the most expensive path of all, because the leak simply returns — often in a new location, since water rarely enters where it appears. ACE’s forensic approach is built to prevent that outcome: find where the water actually enters, confirm it, fix the cause, and verify the repair with the same testing used on new construction so the owner has documentation the problem is resolved rather than a promise.

How ACE handles kickout and Diverter Flashing

ACE approaches kickout and Diverter Flashing the way a building-envelope specialist should: establish what the code and the building demand first, confirm the assembly can deliver it, then verify it in the field with accredited and diagnostic methods. That order matters. Choosing a product and hoping it qualifies is how most kickout and Diverter Flashing problems begin, and it is the pattern our forensic work uncovers again and again.

What sets the firm apart is an integrated model. The same senior team that designs and reviews kickout and Diverter Flashing also tests it and oversees its installation, which eliminates the finger-pointing that happens when design, testing, and field oversight are split across firms. Backed by a proprietary inspection database, that team turns field and test reports around in about a week, so a problem with kickout and Diverter Flashing does not sit unresolved while a project waits.

The value is prevention. For a fraction of the cost of a defect repair or claim, ACE brings the documentation and accredited method that make kickout and Diverter Flashing defensible — designed right, tested to recognized standards, and recorded to defend. Whether you are starting a project, responding to an RFP, or investigating a problem in an existing building, the goal is the same: kickout and Diverter Flashing that performs when it must.

In practice, that means senior people on the project from first contact rather than a junior inspector reporting back to a principal who never visits the site. It means recommendations framed around what they protect — the investment, the schedule, the reputation, and the people who occupy the building — and stated as conclusions backed by accredited method, not hedged opinions. And it means details a crew can actually build in real field conditions, because an elegant detail that fails on site protects no one. For kickout and Diverter Flashing, that combination of design authority, accredited testing, and forensic depth is what turns a specification into a building that stays dry.

How ACE approaches kickout and Diverter Flashing

Assess
Kickout detail

Specify kickouts at every roof-to-wall termination.

Specify
Size

Specify size for flow.

Verify
Barrier integration

Detail laps.

Sources & further reading

Frequently asked questions

Kickout and diverter flashings sit where a roof edge or gutter terminates against a wall, turning water away from the wall and into the gutter. Without a kickout, water flowing off the end of a roof-to-wall step flashing is dumped directly onto the wall and into the cladding below.
Missing kickout and undersized or flat kickout are among the most common. Without a kickout, water running down the step flashing at a roof-to-wall intersection is dumped directly onto the wall below.
Diagnostic water testing: Testing the roof-to-wall area shows where water enters.
Watch for issues such as stains on walls below roof edges and rot at wall bases below roof intersections. Any of these warrants a closer look before damage spreads.
Kickout detail: Specify kickouts at every roof-to-wall termination.
It depends on the cause and extent. Adding kickouts requires cladding removal. Replacement is reserved for widespread or advanced failure.
ACE

About the author. ACE Building Envelope Design is an FGIA/AAMA-accredited building-envelope consultancy serving commercial, industrial, and institutional projects across the Western U.S. Our prevention-first guidance draws on decades of forensic waterproofing and durability investigation. This article was reviewed by our senior envelope team.